




Item Descriptions
Oven clay "Fimo soft" when heated for 20 to 30 minutes at 120 ~ 130 ℃ is a strange clay hardens as pottery. Order to solidify at low temperature stretching and discoloration is almost no finish to the precise form made. About body temperature will be the softest. And knead well if enough soft can be molded into a shape he wanted. - It is possible to color mixing. Original color can make by mixing a plurality of colors. If - 120 to be able to withstand the conditions of 20 to 30 minutes at 130 ℃ it can be heated (for example such as accessories of the bracket) together. Microwave oven toaster oven can not be used. Oven please use the ones that keep the temperature constant. And safety declaration CE mark and with AP mark. It does not contain toxic pigments to dye.
SHIPPING METHOD
Delivered directly from Japan by Japan Post. Shipment within 3-5 business days. We guarantee careful packing and safe shipping.Please note that in some cases additional import or VAT charges may incur and have to be borne by the client.
1. Standard Shipping
Shipment by Japanpost Registered Mail (Standard). Trackable any time with tracking number. Insurance is not available. Delivery time usually is between 1-3 weeks from the date of dispatch. Some items are not eligible for Standard Shipping.
2. Express Shipping
Shipment by Express Mail Service (SAL). Trackable any time with tracking number. Registered and insured up to a value of $60. Delivery time is usually between 8-20 business days from the date of dispatch.
3. Expedited Shipping
Shipment by Expedited Mail Service. Trackable at any time with tracking number. Registered and insured up to a value of $200 and usually delivered in 2-6 business day from the date of dispatch.
| Standard Shipping | Express Shipping | Expedited Shipping | |
|---|---|---|---|
| Shipping Method | Japanpost Registered Mail (Standard) | EMS (Express Mail Service) | EMS (Expedited Mail Service) |
| Trackable | Yes | Yes | Yes |
| Insured | N/A | Yes (Up to $60.00) | Yes (Up to $200.00) |
| Asia | 1-3 weeks | 5-10 days | 2-5 days |
| Oceania; North America; Central America and the Middle East | 2-4 weeks | 6-14 days | 2-6 days |
| Europe | 2-4 weeks | 6-16 days | 3-8 days |
| South America and Africa | 2-4 weeks | 10-18 days | 4-8 days |
