High Quality Pull Up Bar
 
 2 Tone Colours
 
Support Up To 100KG
 
 

 

 

Product Descriptions :-

 

 

Installation Method 1:

 





Step 1: Rotating horizontal bar 2 head (a head clockwise,1 head of inverse clock), turn to 2 end near the installation area 2 side, juz card master as the standard.

 

 

 

Step 2: Card good goods continue to rotate middle pole (sponge position) untill 2 end can't elongation so far.

 

 

 

Step 3: every time before use check the installation is firm.

 

 

 

 

 

Installation Method 2:-
 
Step 1: The plus fixed pad with the screws on both sides
 
Step 2: with the hight bar recess alignment mat.
 
Step 3: Set Good.
 

 

Package Contents :-