Rock fiber putty 3.5kg (with a curing agent 80g)










Item Descriptions

It is ideal for the reinforcement of the location and cutting and patching part with a hole in the two-component polyester resin putty
ultra-thick layer capable of carbon-fiber-filled putty
■ carbon-fiber-filled. ■ has excellent adhesion at a speed drying. ■ It is anti-rust steel plate corresponding type. Please go to finish in the middle putty or polyester putty or the like after the surface polishing ※.
■ Since the putty dry per the speed low-temperature type standard type and high temperature type is not the type that conforms to the season maker manufactures becomes a commodity manufacturer factory type. (Example: summer type has not been manufactured in the winter.)



SHIPPING METHOD

Delivered directly from Japan by Japan Post. Shipment within 3-5 business days. We guarantee careful packing and safe shipping.Please note that in some cases additional import or VAT charges may incur and have to be borne by the client.

1. Standard Shipping

Shipment by Japanpost Registered Mail (Standard). Trackable any time with tracking number. Insurance is not available. Delivery time usually is between 1-3 weeks from the date of dispatch. Some items are not eligible for Standard Shipping.

2. Express Shipping

Shipment by Express Mail Service (SAL). Trackable any time with tracking number. Registered and insured up to a value of $60. Delivery time is usually between 8-20 business days from the date of dispatch.

3. Expedited Shipping

Shipment by Expedited Mail Service. Trackable at any time with tracking number. Registered and insured up to a value of $200 and usually delivered in 2-6 business day from the date of dispatch.

 Standard ShippingExpress ShippingExpedited Shipping
Shipping Method Japanpost Registered Mail (Standard) EMS (Express Mail Service) EMS (Expedited Mail Service)
Trackable Yes Yes Yes
Insured N/A Yes (Up to $60.00) Yes (Up to $200.00)
Asia 1-3 weeks 5-10 days 2-5 days
Oceania; North America; Central America and the Middle East 2-4 weeks 6-14 days 2-6 days
Europe 2-4 weeks 6-16 days 3-8 days
South America and Africa 2-4 weeks 10-18 days 4-8 days