


Item Descriptions
[Features] double of water stopping effect in close contact with the drain outlet top and inside to stop the water. Soft rubber portion of the side is well in close contact with the drain outlet to stop the water. Length 670mm of a chain. [Construction conditions] If there is a cross of garbage received within 18mm from size 44 ~ 46mm drainage note verbale side of the drainage port to match the rubber stopper can not be used. The tile tub may not be available. You can not be used if there is a cross of garbage received within 18mm from size 44 ~ 46mm drainage note verbale side. The tile tub may not be available.
SHIPPING METHOD
Delivered directly from Japan by Japan Post. Shipment within 3-5 business days. We guarantee careful packing and safe shipping.Please note that in some cases additional import or VAT charges may incur and have to be borne by the client.
1. Standard Shipping
Shipment by Japanpost Registered Mail (Standard). Trackable any time with tracking number. Insurance is not available. Delivery time usually is between 1-3 weeks from the date of dispatch. Some items are not eligible for Standard Shipping.
2. Express Shipping
Shipment by Express Mail Service (SAL). Trackable any time with tracking number. Registered and insured up to a value of $60. Delivery time is usually between 8-20 business days from the date of dispatch.
3. Expedited Shipping
Shipment by Expedited Mail Service. Trackable at any time with tracking number. Registered and insured up to a value of $200 and usually delivered in 2-6 business day from the date of dispatch.
| Standard Shipping | Express Shipping | Expedited Shipping | |
|---|---|---|---|
| Shipping Method | Japanpost Registered Mail (Standard) | EMS (Express Mail Service) | EMS (Expedited Mail Service) |
| Trackable | Yes | Yes | Yes |
| Insured | N/A | Yes (Up to $60.00) | Yes (Up to $200.00) |
| Asia | 1-3 weeks | 5-10 days | 2-5 days |
| Oceania; North America; Central America and the Middle East | 2-4 weeks | 6-14 days | 2-6 days |
| Europe | 2-4 weeks | 6-16 days | 3-8 days |
| South America and Africa | 2-4 weeks | 10-18 days | 4-8 days |
